21 Moorfields

Sir Robert Mcalpine


21 Moorfields is a high-quality commercial development situated in the City of London. The 15-storey development will provide approximately 74,000m² of floor space incorporating football field sized trading floors, office space, restaurants, retail, six roof terraces and a multi-level wellness centre.

21 Moorfields
Sir Robert McAlpine


21 Moorfields is a high-quality commercial development situated in the City of London. The 15-storey development (plus two mezzanine levels) will provide approximately 74,000m² of floor space incorporating football field sized trading floors, office space, restaurants, retail, six roof terraces and a multi-level wellness centre.

Powerday have been providing a range of waste services throughout the construction of the development  including skip hire, compactor collections and hazardous waste management.

“Powerday have been as adaptable as possible to our needs, they have provided effective waste management services on a highly congested site and in a sensitive location. Powerday’s digital tickets and online document portal has also helped us streamline our project reporting and demonstrate compliance with our legislative demands. Their off-site recycling facilities also achieved our target of sending zero waste to landfill.” Tom King, Sustainability Manager at Sir Robert McAlpine. 

Powerday’s partnership with Sir Robert McAlpine is helping delivering their ‘Build Sure’ sustainability strategy which is designed to deliver year-on-year improvements in four key areas: Carbon, Resource efficiency, Ethical procurement, & Social value. 

Sir Robert McAlpine has recently announced a further strengthening of its commitment to decarbonisation, with the validation of its science-based net-zero target by the Science Based Targets initiative (SBTi). Sir Robert McAlpine has committed to reducing absolute scope 1, 2 and 3 GHG emissions from purchased goods and services 42% by 2030 and 90% by 2045 from a 2020 base year. Building towards an overall commitment to reach net-zero green greenhouse gas emissions across the value chain by 2045.

Request a Callback

Please fill in the form below.

Required
Required
Required
Required

Prefer to have a chat? Give us a call on 020 8960 4646

We were pleased to have awarded this contract to Powerday.  They have delivered their services efficiently and reliably, achieved high recycling rates and 100% recovery, meeting our requirements throughout the project.  They have been easy to deal with, reasonable and fair.  We have been particularly impressed with their account management and waste reporting capabilities

Dave France, Project Director, Ecoworld Ballymore

Open Account

Please fill in the form below to start the process of opening an account with us. We will perform a credit check and then contact you to complete the process.

Required
Required
Required
Required
Required

Book a Skip

Please fill in the form below and we will get back to you as soon as possible.

Required
Required
Required
Required
Required
Required